Learn
Sewer Lateral Repair Rebate in Los Angeles: Eligibility, Documents and Deadlines
Two City rebates, a short list of documents, and two deadlines that are easy to miss. Plan the paperwork before the work, not after.
By Angeleno Sewer Line Repair · Updated
The sewer lateral repair rebate in Los Angeles is an LA Sanitation (LASAN) program that pays up to $2,500 toward repairing your private sewer lateral, plus up to $300 for a camera inspection. Both are for City of Los Angeles sewer customers, both are first come, first served while each year’s funds last, and both depend on paperwork.
The program details below reflect LASAN’s rebate pages as checked in October 2026. Funds are limited and the City can change the terms, so treat this as a guide to preparing, not a promise that money will be there. Angeleno Sewer Line Repair is not part of the City program and cannot approve or guarantee a rebate; what helps is planning the job so the documents the City asks for are produced along the way. For how the rebate fits into the overall budget, see the replacement cost guide.
The two rebates side by side
| CCTV (camera) rebate | Repair rebate | |
|---|---|---|
| Amount | Up to $300 | Up to $2,500 |
| What it covers | A video inspection of the private sewer lateral by a licensed and bonded sewer contractor, with a written report | Repair of the private sewer lateral by a licensed and bonded sewer contractor |
| Timing window | The inspection must not be more than 6 months old when you complete the application | The final permit must have been signed by the City’s inspector no more than 60 days before you complete the application |
| Key proof | Video showing your address at the start, plus the inspection report | Video showing the address and the damage, the final CCTV report, and the City-signed final permit |
| Funding | First come, first served until the year’s allocated funds are exhausted | |
Because they are separate rebates, the camera inspection that finds the problem and the repair that fixes it can each be submitted, as long as each meets its own requirements and window.
Who is eligible
LASAN describes the rebates as available to rate-paying property owners of residential, multifamily, commercial and industrial property who pay the sewer service charge to the City of Los Angeles. A few consequences follow from that wording:
- You must be in the City’s sewer billing. Owners in Pasadena, Glendale, Burbank and unincorporated County areas pay sewer charges to their own agencies, and the LASAN rebate does not apply to them.
- It is for owners. A resident cannot claim it, which fits the City’s rule that the lateral is the owner’s responsibility.
- Commercial and multifamily property qualify. It is not limited to single-family homes.
- The work must be done by a licensed and bonded sewer contractor. That requirement appears on both rebate pages. Owner-performed work does not fit it.
Documents for the repair rebate
LASAN’s repair rebate page lists what to submit:
- The official LASAN application.
- The contractor’s invoice, showing the contractor’s license number, itemized costs of materials and labor for the lateral repair, the date of the work, your property address, and evidence that it was paid in full.
- The inspection video, showing the address at the beginning of the video as well as the damage that needed repair.
- The final CCTV inspection report, describing the damage that was repaired.
- The final permit signed by a City of Los Angeles inspector for the repair.
- Your most recent DWP bill.
- Your APN, the assessor’s parcel number from your property tax bill.
- A completed IRS W-9, which LASAN says is required only after the rebate is approved.
- A signed Release and Waiver of Liability.
The camera rebate asks for a similar set: the application, an itemized and paid invoice with the license number and date, the video showing your address at the start, the inspection report, the DWP bill, the APN, the W-9 after approval, and the signed waiver.
The details that sink applications
Most rebate problems are preventable at the time of the job, not afterward.
A lump-sum invoice. The City asks for itemized materials and labor. An invoice that says only “sewer repair, $X” does not meet that. Ask for itemization when you agree to the work.
A video without the address. The camera recording must show your property address at the beginning. That is easy to do on the day and impossible to add later. It is also the simplest way to prove the footage is of your line, which matters for the City and for you.
No video of the damage. For the repair rebate, the video has to show the damage that was repaired. If the line was opened up and fixed without filming first, that evidence is gone. Film before any repair, then again afterward.
No finaled permit. The repair rebate depends on a final permit signed by a City inspector. That means the work has to have been permitted in the first place: an LADBS plumbing permit for private-side work, and a Bureau of Engineering S-Permit for work in the street. Unpermitted work cannot produce the document. The permit guide explains which permit applies where.
Running out the clock. The 60-day window starts when the City inspector signs the final permit, not when you receive the invoice. If paperwork from the contractor is slow, the window can close while you wait. The 6-month window for the camera rebate is longer but just as firm.
Cleaning instead of repair. Clearing roots or jetting a line restores flow but is not a repair (see hydro jetting vs repair), and it needs no permit, so it does not generate the finaled permit the repair rebate requires.
How to apply
LASAN takes applications through MyLA311, the City’s service request system. Its pages give two routes to the form: search for “Sewer or Sidewalk Rebates” under New Request, or go to All Service Requests, choose General Inquiry/MISC, then “Sewer or Sidewalk Rebates.” Applicants can contact the Sewer Lateral Rebate Program by email at San.SLRebates@lacity.org. LASAN’s 24-hour Customer Care Center, 1-800-773-2489, is listed for assistance with applications and general questions.
The order that works best:
- Film the line with a sewer camera inspection by a licensed and bonded sewer contractor, with the address shown at the start. Keep the video file and the written report. If you plan to claim the camera rebate, note the date; you have up to 6 months.
- Decide on the repair from the footage. The repair vs replacement guide covers how.
- Confirm in writing that the contractor will pull the right permits, film the damage before repair and the result afterward, and provide an itemized invoice with the license number.
- Do the work and get the final inspection. The City inspector’s sign-off starts the 60-day clock.
- Submit promptly through MyLA311 with every document on the list.
How much it changes the math
On a small job, the rebates can be a meaningful share of the cost. A camera inspection’s typical cost overlaps the $300 maximum, and a spot repair of one section can be offset noticeably by $2,500. On a full sewer line replacement, especially one that reaches the street, the rebate is a helpful contribution but a small fraction of the total. It should never be the reason to choose one repair over another; choose the repair from the footage, then apply for whatever the City offers.
It is also worth remembering that the amounts are maximums, “up to” figures, and that funds are allocated each year. If the year’s allocation is exhausted when you apply, there may be nothing to receive until funds are renewed. LASAN’s page is the only authority on current availability, so check it before counting on the money.
If you are outside the City of Los Angeles
The LASAN rebates are tied to City of Los Angeles sewer service. Burbank runs its own lateral rebate program for single-family homes and duplexes, with its own terms. Pasadena, Glendale and County areas set their own policies. For any property outside the City, check your own city’s Public Works pages before planning around a rebate, and see the responsibility guide for how each city defines the owner’s part of the line.
A short checklist to keep with the job file
Before the job: confirm the contractor is licensed and bonded, the permits are in their name, and the invoice will be itemized. On the day: the address is on the video, and the damage is filmed before it is removed. After: the City inspector’s final sign-off date is noted, and the application goes in well inside 60 days. That is the whole difference between an approved rebate and a rejected one.
Questions about your own line?
Phones answered 24/7, every day. A camera inspection answers most of them.
Questions people ask
How much is the Los Angeles sewer lateral repair rebate?
LA Sanitation offers up to $2,500 toward a repair of the private sewer lateral by a licensed and bonded sewer contractor, and a separate rebate of up to $300 toward a camera (CCTV) inspection. Both are first come, first served until each year's allocated funds run out, so neither amount is guaranteed to be available when you apply.
How long do I have to apply for the LASAN repair rebate?
LA Sanitation's page says the final permit for the repair must have been signed by the City's inspector no more than 60 days before you complete the rebate application. For the camera rebate, the inspection must not be more than 6 months old. Missing either window disqualifies the work, so start gathering documents as soon as the job is done.
Can I get the rebate if I live in Pasadena, Glendale or Burbank?
Not the LASAN rebates. They are for property owners who pay the sewer service charge to the City of Los Angeles. Other cities run their own programs or none. Burbank, for example, has its own lateral rebate program; check the current terms with that city's Public Works department.