Rebuilding in the Palisades: Reconnecting the Sewer Lateral

Every rebuilt house in the City's fire area has to be reconnected to the sewer. Here is what the City's June 2026 handout requires, and the order to do it in.

By Angeleno Sewer Line Repair · Updated

If you are rebuilding a house in Pacific Palisades after the January 2025 fire, reconnecting it to the City sewer requires a Bureau of Engineering S-Permit and a camera inspection of the existing lateral before any reconnection work begins. The City’s rebuilding handout, published in June 2026, sets out when an old lateral can be reused and when it must be repaired or replaced first.

The lateral is the pipe from your lot to the City’s main in the street. A lateral that was buried during the fire is out of sight, so its condition is unknown until it is filmed, which is exactly why the City asks for video first. Angeleno Sewer Line Repair arranges camera inspections and repairs through licensed, bonded and insured contractor partners, with street-side work by a City of LA Bonded Sewer Contractor. This post summarizes the handout; read the original before you apply.

What the City requires before reconnecting

According to the handout, owners must apply for an S-Permit, perform a CCTV inspection of the existing lateral, and schedule a City inspection before any reconnection work begins. The handout is direct about the order: do not start work before inspection. The inspector is meant to witness and document the lateral’s condition, and unauthorized work may result in delays or corrections.

The handout also restates who owns what. The property owner is responsible for maintaining the lateral, including the section in the public right-of-way between the property line and the connection to the main. Only one lot may connect to one lateral, and shared laterals are generally not permitted for new reconnections. If your lot and a neighbor’s once shared a line, raise it early.

What the camera is looking for

The City uses the CCTV results to decide whether the lateral can be reconnected or must be repaired or replaced first. The handout lists the findings that matter: root intrusion, cracks or broken pipe, offset joints, collapsed sections, blockages and other damage. Our guide to reading a sewer inspection report explains how those defects appear on video, and sewer camera inspection covers what the inspection involves.

When an old lateral can be reused

The handout sorts existing laterals into four outcomes:

  • A 4-inch house connection in good condition: reconnection is generally allowed, and upsizing to 6-inch pipe is not required solely for reconnection.
  • Any lateral in good condition: reconnection will be approved.
  • A lateral in poor condition that still flows and will not damage the roadway or right-of-way: reconnection may still be allowed, and the owner may choose to reconnect as-is.
  • A lateral in poor condition that could damage the roadway, create sinkholes, cause exfiltration or leakage, or affect the right-of-way: it must be repaired or replaced before reconnection.

An owner who reconnects a damaged lateral as-is may be required to sign an acknowledgment. Among other points, it states that the property was damaged in the 2025 fires, that CCTV found existing damage, that the lateral remains functional and does not currently threaten the roadway, and that the owner accepts responsibility for future maintenance and repairs. Once the Bureau determines the lateral does not imperil the roadway, it coordinates with inspection staff to finalize the permit.

Should you reconnect as-is?

The as-is option saves money now, but it is a decision to defer work, not avoid it. A rebuild is often the cheapest moment to replace a lateral: the lot is open, landscaping and hardscape are not yet built over the line, and equipment is already on site. Replacing it after a new driveway and garden are in means cutting through both. If the camera shows roots, offsets or a sag, weigh the cost of fixing it now against the cost of tearing up finished work later. For work past the property line, see sewer lateral repair under the street.

How to apply

The handout walks through the online application in the BOE Customer Portal. In short: choose the Sewer Connection (S) Permit, sign in with an Angeleno Account, select the option for constructing a new building and reconnecting at the property line, choose “Reconnection” as the type of work, and enter “Requesting a permit for reconnection and CCTV” in the comments. Then select “Windstorm and Fires January 2025” to mark the project as fire-related, and submit. You receive a confirmation email and a reference number.

To schedule the required inspection before work, the handout lists the Bureau of Contract Administration at 213-485-5080 or its online inspection request form. For street trees near the line, it lists StreetsLA’s Urban Forestry Division at 213-847-3077. In-person help is available at the Palisades Inspections and Permitting Support Center, 16925 Marquez Ave., and at the Bureau’s West Los Angeles District Office, 1828 Sawtelle Blvd., 3rd Floor.

The rebate may help

If the lateral is repaired and the property pays the City’s sewer service charge, LA Sanitation’s repair rebate of up to $2,500 may apply, first come, first served while annual funds last. It requires a licensed and bonded sewer contractor, a final permit signed by the City’s inspector no more than 60 days before applying, an itemized paid invoice, and the inspection video and report. Keep the paperwork from the start.

More on the neighborhood is on our Pacific Palisades page, and the full permit process is in the sewer permit guide.